Activity Cost

Activity Cost records the per-hour billing rate and costing rate of an Employee against a particular Activity Type.

This rate is pulled by the system while making Timesheets. It is used for Project Costing.

Activity Cost

To access Activity Cost, go to,

Home > Projects > Time Tracking > Activity Cost

1. How to create Activity Cost

  1. Go to the Activity Cost list and click on New.
  2. Add the name of the Employee for whom you are configuring the Activity Cost.
  3. Add the Costing Rate and the Billing Rate for the Employee.
  4. Save.

Alternatively, an Activity Cost can also be created via an Activity List.

Activity Cost

Next: Articles